March 12, 2021
After Maxar Technologies successfully installed Psyche’s High Gain Antenna, their team moved the Psyche Solar Electric Propulsion (SEP) Chassis to the alignment stand at their factory in Palo...
December 1, 2020
Psyche’s high gain antenna has completed fabrication and is undergoing standard testing in Maxar’s Near Field Range to verify that it will work as intended once launched.
Psyche’s SEP chassis is currently in main body integration in Maxar’s Palo Alto, Calif. manufacturing facility. The equipment panels have been mated to Psyche’s propulsion module and technicians...
October 29, 2020
Images of the Psyche Gamma-Ray Spectrometer flight unit lid with its “special part number,” next to the fully-built engineering test unit. This gamma-ray spectrometer was adapted for space...
October 22, 2020
The Psyche spacecraft is making progress in Maxar’s Palo Alto, California manufacturing facility. In the last few weeks, the solar electric propulsion (SEP) chassis had its equipment panels...